How fiRST Reduces Labour Requirements

Closing the silicone membrane

The composites industry faces a constant challenge: the shortage of qualified labour. Bus, truck, marine, railway and industrial equipment manufacturers are already struggling to find laminators, technicians and operators with sufficient experience to maintain production levels.

This labour shortage has a direct impact on lead times, operational costs and overall delivery capacity — especially for companies that still rely on traditional processes.

Understanding how much labour each manufacturing method requires is therefore essential when looking for optimisation opportunities. And this is precisely where fiRST stands out.

The Labour Shortage in the Composites Industry

In recent years, three main factors have intensified this problem:

  • Retirement of experienced professionals

  • Difficulty in training new laminators to an acceptable standard

  • Low process standardisation in traditional techniques, increasing dependence on manual labour

The result is clear: production capacity is limited by the availability of skilled operators — not by market demand.

How Much Labour Traditional Processes Require

Below is a straightforward overview of how many operators each commonly used composites process typically demands.

1. Hand Lay-Up: the Most Labour-Intensive Process

Hand lay-up requires high levels of skill and a significant amount of manual labour.

Operator-intensive tasks include:

  • Manual cutting of the fibre

  • Layer application

  • Resin control

  • Rolling and consolidation

  • Bubble removal

  • Frequent rework

Fibre Glass Manual Lamination

Consequence:
It is common to require 3 to 6 operators per part, in addition to dealing with low repeatability and high variation between cycles.

2. RTM: more advanced, but still dependent on operators

RTM reduces consumables, but remains a heavy, manual process.

Where labour is required:

  • Opening and closing heavy moulds

  • Mechanical sealing

  • Stack preparation

  • Setting up the injection system

  • Maintaining vacuum levels

  • Cleaning between cycles

Demoulding RTM Mould

Typical teams:
2 to 4 operators per part, depending on the mould size.

3. Vacuum Bagging: high time consumption and demanding in labour

Although an improvement over hand lay-up, vacuum bagging still requires many labour-intensive steps.

Main labour requirements:

  • Cutting and placing consumables

  • Sealing the vacuum bag

  • Frequent adjustments to eliminate leaks

  • Restarting the process for every cycle

  • Disposal of consumables and cleaning

consumable bagging from composite companies UK

Direct impact:
A large portion of the labour hours is spent preparing and sealing the bag, a step that requires skill and attention.

How fiRST Reduces Labour Requirements and Increases Productivity

fiRST eliminates multiple manual steps found in traditional processes and significantly simplifies operations. Its key advantage is the reusable silicone counter-mould, which replaces consumables and creates a lighter, faster and more repeatable process.

Here are the main reasons why fiRST dramatically reduces the number of operators required on the production line:

1. Lightweight Silicone Counter-Mould, easily handled by one person

One of the biggest sources of labour reduction is the lightweight silicone counter-mould, much lighter than rigid tools used in other processes.

  • Can be handled by one operator

  • Requires no physical strength

  • No need for two or more people to position or close the mould

This immediately lowers the minimum team size and speeds up part preparation.

2. Easy and consistent vacuum sealing

With the silicone membrane:

  • No vacuum bag sealing

  • No disposable consumables

  • Vacuum remains stable and consistent

  • Leaks are virtually eliminated

Result: fewer reworks and less need for highly experienced operators.

fiRST technology in the composites market used in infrastructure

3. Much faster preparation between cycles

Because the counter-mould is reusable, the operator simply positions it again and reapplies vacuum.

No cutting consumables, no sealing bags, no adjusting edges.

Cycle preparation time is reduced to minutes, and labour hours per part decrease significantly compared to traditional processes.

4. Real reduction in labour per part

In real production environments, companies using fiRST report:

  • 30% to 60% reduction in labour requirements

  • Higher repeatability and quality

  • Less dependence on experienced laminators

  • Fewer reworks

  • Fewer variables within the production process

This translates into more output per shift with fewer operators.

fiRST technology in the composites market for industrial equipment

Conclusion: In a Time of Labour Shortage, fiRST Is the Most Strategic Solution

The composites sector is experiencing an increasing shortage of qualified professionals. Meanwhile, traditional processes continue to require large teams and long preparation times.

VPI presents itself as an efficient, scalable and modern solution — capable of drastically reducing the number of operators needed while increasing productivity and ensuring greater repeatability.

For companies aiming to grow despite limited labour availability, VPI is not only an alternative.
It is a strategic path for resilience and expansion.

Follow Us On Social Media

Contact Us Today

Want to learn more about or Vortex Injection Valve or any other products & services? Reach out to our team today. 

Share the Post:

Related Posts

We’re exhibiting at

Advanced Engineering 2026 Stand W134

4–5 November 2026 · NEC Birmingham · See reusable silicone tooling in the flesh

Get your free ticket Free entry · registration takes a minute
Alan Harper Composites